Access Road Construction Works for Solar Power Plant in Ignalina District

About the Project

Access road construction works were completed for a solar power plant in Ignalina district.

A total of 18,800 m² of access roads were constructed to ensure reliable access to the renewable energy site. The works included soil excavation, geogrid installation and formation of crushed stone base layers.

Scope of works:

  • 18,800 m² of access road construction
  • Soil excavation and base preparation
  • Geogrid installation
  • Crushed stone base formation