Capital repair works were completed on the hydraulic structure of Joninės pond located on the Varnaka river in Jonava.
The project focused on strengthening and modernizing the existing dam infrastructure to ensure structural durability, operational safety and proper water flow management.
Scope of works:
- Installation of steel gate closures
- Slope reinforcement with reinforced concrete slabs
- Installation of steel railings
- Sandblasting works and paving installation



