Drainage and land reclamation works were completed on modernized sections of the A14 Vilnius – Utena highway.
The project included reconstruction and adaptation of existing reclamation systems to meet the requirements of the upgraded road infrastructure. The implemented solutions ensure proper water management, soil stability and long-term pavement durability.
Scope of works:
- 1,056 m of drainage laterals installed
- 4,441 m of drainage collectors installed
- 76 underground manholes installed
- Reconstruction and integration of reclamation systems into the renewed highway infrastructure