Reconstruction of drainage systems in the Dūdenai and Žalvariai cadastral areas to restore proper agricultural water management.
Scope of works:
-
Installation of 3.52 km of drainage collectors
-
Replacement of 115 drainage outlets
-
Installation of 13 surface water discharge structures
-
Installation of 22 underground inspection wells
-
Reconstruction of 10.25 km of drainage ditches



