Infrastructure construction works were completed for a 20 MW wind farm in Panevėžys district.
The project included site preparation, local road reconstruction, access road construction and installation of drainage systems required for long-term operation of the wind energy facility.
Scope of works:
- 4.46 km of local road reconstruction
- 38,975 m² of access roads constructed
- 65,290 t of sand and 26,458 t of dolomite aggregate used for base layers
- 81,555 m² of geotextile and geogrid installation
- 2,002 m of drainage collectors installed
- 1,136 m of drainage laterals installed
- Dismantling of existing bridge
- Installation of Multiplate culvert (7.34 m × 3.51 m)