Infrastructure construction works were completed for a 4-turbine wind energy project in Kupiškis district.
The project included local road reconstruction, construction of access roads and operational platforms, base reinforcement and installation of drainage systems necessary for long-term and stable operation of the wind farm.
All works were carried out in accordance with engineering standards to ensure structural stability, proper load distribution and efficient water management.
Scope of works:
- 2.83 km of local road reconstruction
- 63,045 m² of access roads and operational platforms constructed
- 73,078 t of sand and 26,888 t of dolomite aggregate used for base layers
- 86,250 m² of geotextile and geogrid installed
- 1,852 m of drainage laterals installed
- 2,680 m of drainage collectors installed